Reason For Phase 2 implementation
• Electricity cost saving opportunity.
• Battery backup system implementation to run warehouse operation during power cut.
• Contribution for carbon foot print reduction.
• National responsibility to contribute power generation Because srilanka is in power crisis.
• Government predicted that current tariff will increase by 200% in 2022.
• There will be huge increase in solar PV material price in 2023.
• Total Power Generation after 2nd phase = 200kVA
• Expected total power generation = 264,000 kWh
• CO2 emission reduction = 190 tons
• Annual cost saving = 2,904,000 LKR = 8,066 USD
• Plant total solar installation capacity = 700kVA